Presetting

Payback Calculator


This evaluation is based on off-line measurement and
pre-qualification of the tool assemblies. Hidden cost savings not included are reduction in scrap rates, increase in tool life and overall improved inspection of the cutting tools.

R

T

TM

N

S

TP

LR

PP

MU

Results

Current Cost/Year

CC = $

R * T * (TM / 60) * N * S * MU

Savings Per Year

SY = $

CC – PC

Proposed Cost

PC = $

T * N * S * (TP/60) * LR * MU

Payback Period

 

PP / (SY/12)